• Need Help? 866-232-5673 M-F 9AM-3PM CST

FREE SHIPPING ORDERS OVER $200
Only within the Continental U.S.

Dedicated Project Manager Assigned To Every Quote

Build Your Commercial Door Package Online

Storefront glass doors, commercial steel doors, commercial wood doors, frames, and hardware - all configured through one easy-to-use builder. Submit your project in minutes and receive a custom quote within 24 hours from a dedicated Project Manager who reviews your opening, verifies specifications, and helps ensure your project is configured correctly.

Work directly with commercial door specialists - not order takers.

Home > Support > Glass Pro Hardware Technical Support > Glass Pro Hardware FGD200 Series Installation Instructions

Glass Pro Hardware FGD200 Series Installation Instructions

Glass Pro Hardware FGD200 Series Specifications

Header and Jamb Preparation

Door Header
Drill and counter-sink outside top surface for 10-32x3/8" and 1/4-20 x 1-1/4" flat head screws as shown.

Cover Plate
Drill 1 / 3 4" hole as shown. Drill / 1 2" hole as shown.

Hinge Jamb
Drill holes for 8-32 x 1/2" pan head self-threading screws as shown.

Install anchor using 8-32 x 1/2" pan head self-threading screws.

Mount door header on anchor using 10-32 x 3/8" flat head self-threading screws.

End Loading Installation
TOP DOOR RAIL
"A" Type End Loading Arm - Make a 1" deep cut-out in hinge edge of door as shown. "PT" Type End Loading Arm - Make a 7/8" deep cut-out in hinge edge of door as shown. Drill or drill and tap holes in top of door as shown. position arm in door by placing arm pin in 3/16" hole. Install arm using three 1/4-20 x 5/8" pan head machine screws and lock washers. Center arm in the top of the rail by adjusting the two 1/4-20 x 1" hex head centering bolts. NOTE: After the door is installed, the two 1/4-20 x 1" socket head clamp bar cap screws with lock washers must be tightened securely.

BOTTOM DOOR RAIL
End Loading
Make cut out in hinge edge of door equal to depth of bottom rail as shown. Drill and tap 1/4-20 holes in bottom rail of door as shown. Install pivot bearing retainer in bottom of door using two 1/4-20 x 5/8" pan head machine screws and lock
washers. Laterally adjust center of pivot bearing retainer 25/8"(or 211/16") from hinge edge of door (not including weatherstripping) and tighten screws securely. NOTE: For doors with 1" bottom rail depth, pivot bearing stud must be shortened by sawing off at score1/2" from bottom.



Need Help?

Give Us A Call At 866-232-5673 or Text Us With Photos At 210-275-8966

Whether you need a quotation or just have a question about a product. Reach out to us today by calling 866-232-5673 or text us questions and photos at 210-275-8966, and one of friendly specialists will be happy to help!

Empty Cart