Office-Lite Single Aluminum Knock Down Drywall Frame Installation Instructions
Tools Required: Tape Measure, Level, Plumb Bob, File, Rubber Mallet, Drill, Miter Saw with carbide tipped blade.
Step 1: Check the dimensions and square of rough opening. Cut vertical jambs if necessary.
Step 2: Slip header and vertical jambs into opening. Header will overlap jambs 3/8".
Step 3: Align to scheduled opening width and height, achieving equal wall capture on both jamb legs. Check level of header, square and plumb jamb legs.
Step 4: Attach four flat angles (C100ST) with #8 x 1/2" wafer head self drilling screws at all faces of jamb and header.
Step 5: Check square, plumb and opening width. Anchor jambs to wall using #6 x 1-5/8" drywall screws through round holes nearest top and bottom of each hinge and 12" OC elsewhere. Attachment should roughly align on both front faces.
Step 6: Install trim by hooking outer leg on the receiver tab and tapping lightly with rubber mallet toward the inner edge.
Step 7: Anchor hinge plates to metal studs using the provided #10 x 2" screws.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()